Utility Extension Plans
In some cases, the public utilities and/or public infrastructure are not close enough to the proposed development. Or maybe the current utility is not adequate for what is being constructed. In these cases, similar to the Frontage Improvement Plan, a plan must be prepared to municipality specifications, outlining the size, location and type of utility required within the public space.